SES Construction and Fuel Services LLC

SES Construction and Fuel Services LLC

Construction Services

SCF’s personnel have been providing quality civil, vertical, horizontal and environmental construction and construction management services to government and private industry for over 22 years. We pride ourselves on our ability to build strong customer-client relationships resulting in repeat business.

Capabilities include:
Installation of 48,000 sq. ft. of reflective roofing system at Randolph AFB

  • Design/build construction
  • Sustainment, restoration and modernization (SRM)
  • Mechanical and electrical
  • Building envelope
  • Life and safety codes
  • Utilities installation
  • Plumbing and piping
  • Military ranges
  • Instrumentation and controls
  • HVAC and energy/thermal efficiency
  • Engineering – civil, mechanical, environmental, chemical, geotechnical
  • Operation and maintenance
  • Rehabilitation of water control structures
  • Demolition and green deconstruction

SES Construction and Fuel Services is proud to have supported the Department of Defense’s Sustainment, Restoration and Modernization (SRM) program since 2010 by delivering design-build projects at U.S. Air Force medical facilities worldwide. This work is comprised of mechanical, electrical and/or building envelope infrastructure renovations and upgrades. For additional information about the experience of SCF and the SES Group of companies in this program, click here

PROJECT EXAMPLES

Foundation, Flooring and Drainage Upgrades – Andersen AFB, Guam See project detail here
This was a $3.42 million project to repair the foundation, flooring and site drainage in an occupied medical facility. SCF’s project manager and site superintendent were both “coined” by the Air Force for the outstanding success of this project which was completed 60 days ahead of schedule and solicited the following praise:

“I want to thank you for the the amazing job you are doing at our facility…communication and coordination have been continuous and flawless. Quality of workmanship has been spotless…”

Emergency Waterline Installation – Fort Belvoir, Virginia
SCF improved the existing Fort Belvoir water distribution system to allow a direct supply from the existing water storage tanks to the new Fort Belvoir Community Hospital. We installed 4,500 feet of new domestic waterline consisting of: 16” ductile iron piping with 15 SCADA valves in associated vaults, one new remote read water meter, and one new 90kW backup generator.

“Thanks very much for your great work and attitude. It wasn’t easy, but you guys hit a home run.”

Modernization of the Electrical Distribution System – Scott AFB, Illinois
SCF provided the Base’s 55-year old clinic with reliable electric service with proper grounding, and devised a solution to the facility’s needs that other parties were not able to execute without several multiple day outages nor fit into the allotted space. Without interruption to patients or staff, we removed 6 transformers, associated medium voltage switches, cabling and an antiquated main distribution center from inside the building and replaced it with two transformers and a custom-built distribution center.

“Thank you for the spectacular job your company and your subcontractors did….The planning and scheduling of work was stellar. Your ability to complete work without interruption to our mission has raised the bar to new standards.”

- Facility Manager, 375th Medical Group, Scott AFB

Download more SCF construction projects here:
Exterior Building Envelope – Fairchild AFB
Mechanical Building Infrastructure – McGuire AFB
BAS and Water Services Devices – Hill AFB

Copyright © 2017 SES Construction and Fuel Services LLC Knoxville Web Design